LOCATION
Dublin, Ohio
COMPLETION
2016
SCOPE
Addition
Renovation
Dublin City Schools contracted with our team in 2014 to provide a district wide master plan. With steady growth in enrollment it was quickly determined during the master planning study that building additions were needed. A total of six elementary schools received additions to help offset the growth. Our in-house engineering teams worked to design the systems for the additions to integrate seamlessly into the existing building systems. These systems included fire alarm, access control/security, technology network, public address, sprinkler, temperature control/energy management, and plumbing systems.

In addition to the master plan, we were contracted to provide a district wide building assessment. The goal was to document the current condition of all the facilities, identify components in need of repair, flag items that were nearing the need for replacement, and make overall recommendations. This assessment worked hand in hand with the master plan to give the Board of Education an up-to-date analysis of their future building needs.


Furthermore, our team worked with Dublin City Schools on several projects throughout the district. Davis Middle School gymnasium received a renovation which included a new gym floor. Jerome High School needed a larger kitchen serving area. Our team was able to acquire space from an adjacent classroom to allow for the increase. Paving and flooring improvements have also been done throughout the district.